The terminal building at a regional airport in Middletown, Pennsylvania, had been protected by the same TPO single-ply roof for more than two decades. The membrane showed noticeable wear, and airport management had growing concerns about its efficiency and long-term integrity. Instead of scheduling a disruptive tear-off at an active transportation facility, the airport restored the 14,000-square-foot roof with a fluid-applied system from American WeatherStar.
Replacing a roof over an operating airport terminal is a logistical headache: passenger traffic, security zones, and constant building operations all limit how and when crews can work. The aging TPO membrane still had structural value as a substrate, which made restoration attractive, but the system chosen needed to bond reliably to a weathered thermoplastic surface and stand up to decades more service.
Crews cleaned the membrane with EcoCleaner 925 to remove contaminants and prepare the surface for adhesion. Penetrations and problem areas were sealed with Aromatic Urethane 520, giving the roof’s most leak-prone details a reinforced waterproof layer. The team then applied an intermediate coat of Silicone 410 across the field, followed by a top coat of Silicone 410 blended with roofing granules, which adds abrasion resistance and improves traction on the finished surface.
An independent third-party inspection confirmed the quality of the completed restoration, and the system carries a 15-year material warranty covering normal weathering and manufacturing defects. The terminal gained improved durability, weather resistance, and energy efficiency without a single day of tear-off disruption, and the airport deferred the capital cost of full replacement by well over a decade.
A Huntsville strip mall's eroding acrylic roof coating was trapping moisture against the metal panels; Arkbow…
Aug 3, 2026After an EF-2 tornado tore into a 1 million sq ft Garland warehouse, contractors rebuilt the…
Jul 28, 2026A 25-year-old metal roof on an Asheville volunteer fire station, roughly 17,200 sq ft, was renewed…
Jul 22, 2026Get matched with a verified roof coating contractor near your building — free estimate within 24 hours.
Verified and Premium contractors get SEO-boosted project spotlights that rank on their state pages — and turn finished roofs into new leads.