Silicone Restoration Membrane Buys Midview High School 11 More Years, Grafton OH — completed roof coating project
Project Details
LocationGrafton, Ohio
Building TypePublic high school
Coating SystemSiliconeSilicone Restoration Membrane (SRM), 25-mil membrane with silicone-sealed seams
Warranty11-year full-system warranty
Project documented by the published case study.

Midview High School in Grafton, Ohio, faced a roofing decision with an unusual constraint: the district planned to move students into a new building in roughly 11 years. The existing roof’s seams were losing adhesion and the membrane had only a few years of expected life left, but a full replacement made little financial sense for a building with a defined end date. West Roofing Systems proposed a silicone restoration membrane sized precisely to the school’s timeline.

The Challenge

The failing seams put the roof at growing risk of leaks over occupied classrooms, and doing nothing would have meant managing escalating repairs until the move. A tear-off and re-roof would have solved the problem but consumed capital the district preferred to direct toward its new facility. The school needed a middle path: dependable, warrantable waterproofing that would last just long enough.

The Coating Solution

West Roofing began with a full roof assessment, including nine adhesion tests across the existing membrane to confirm the roof was a sound candidate for restoration. After power washing the surface to remove dirt and contaminants, crews applied silicone to all of the roof’s seams and then coated the entire field with a 25-mil silicone restoration membrane, creating a seamless, monolithic waterproofing layer over the aging roof.

The Results

The school’s roof is now leak-free and covered by a full-system warranty that runs through year 11, aligned almost exactly with the district’s relocation plan. The restoration cost significantly less than a tear-off replacement and extended the roof’s useful life by more than a decade beyond its original trajectory. It is a textbook case of matching a roofing investment to a building’s actual remaining service horizon.

Project photos

Completed roof after coating — Public high school
Need work like this in Grafton, Ohio?Browse verified roof coating contractors near this project, or let us match you with the right crew.
More projects

Recent roof coating spotlights.

Project Spotlights

KNIGHTSHIELD Silicone Replaces a Failing Acrylic Coating in Huntsville AL

A Huntsville strip mall's eroding acrylic roof coating was trapping moisture against the metal panels; Arkbow…

Project Spotlights

Color-Gard Acrylic Restoration of an Asheville NC Firehouse Roof

A 25-year-old metal roof on an Asheville volunteer fire station, roughly 17,200 sq ft, was renewed…

Want results like this on your roof?

Get matched with a verified roof coating contractor near your building — free estimate within 24 hours.

Do work like this?

Verified and Premium contractors get SEO-boosted project spotlights that rank on their state pages — and turn finished roofs into new leads.